Testing system and method for testing of electrical connections

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759743
APP PUB NO 20150233969A1
SERIAL NO

14552957

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A testing system includes a test machine, a plurality of probe sets, a data input device, a controller, a memory, and a data output device. The test machine has a platform for a DUT to be placed thereon, and a test arm which is movable relative to the platform. The probe sets are provided on the test machine with at least one probe set provided on the test arm to contact the DUT. The data input device is used to input information about the DUT. The controller is electrically connected to the test arm, the probe set on the test arm, and the data input device to move the test arm to a predetermined position according to the inputted information, and to make the probe set contact the DUT for electrical test. The memory saves electrical test result, which is outputted by the data output device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MPI CORPORATIONNO 155 ZHONGHE ST ZHUBEI CITY HSINCHU COUNTY 30267

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ku, Wei-Cheng Zhubei, TW 50 172
Lu, Shao-Wei Zhubei, TW 23 146
Wang, Yu-Tse Zhubei, TW 7 3
Wei, Hao Zhubei, TW 57 505

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00