Trip hazard measurement gauge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759559
SERIAL NO

15351435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A trip hazard measurement gauge is, except for a measurement module and display, constructed primarily of aluminum. A cylindrical tube has an upper straight section and a lower straight section that are interconnected by a curved section. The upper straight section and the lower straight section form an obtuse angle. A cylindrical aluminum housing is connected to the tube via a conical connecter piece. A non-movable foot is rigidly connected to the cylindrical housing. A measurement module is installed within the cylindrical housing. A slidable rule, to which a movable foot is attached to a lower end thereof, extends from the measurement module. A return spring ensures that the movable foot returns to its lowermost position. After turning ON the display, selecting the measurement system and zeroing the gauge, it is ready to measure differences in elevation between adjacent sidewalk slabs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PREC CONCRETE CUTTING INCNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haney, Matthew B Ceder Hills, US 3 24
Lamb, Michael E American Fork, US 2 5
Ollivier, Aaron C Pleasant Grove, US 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00