High efficiency ejector cycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759462
SERIAL NO

13703490

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system has a compressor, a heat rejection heat exchanger, first and second ejectors, first and second heat absorption heat exchangers, and a separator. The ejectors each have a primary inlet coupled to the heat rejection exchanger to receive refrigerant. A second heat absorption heat exchanger is coupled to the outlet of the second ejector to receive refrigerant. The separator has an inlet coupled to the outlet of the first ejector to receive refrigerant from the first ejector. The separator has a gas outlet coupled to the secondary inlet of the second ejector to deliver refrigerant to the second ejector. The separator has a liquid outlet coupled to the secondary inlet of the first ejector via the first heat absorption heat exchanger to deliver refrigerant to the first ejector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARRIER CORPORATIONONE CARRIER PLACE FARMINGTON CT 06034

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Hongsheng Shanghai, CN 24 160
Radcliff, Thomas D Vernon, US 55 797
Verma, Parmesh Manchester, US 122 950
Wang, Jinliang Ellington, US 68 360
Zou, Jiang Zhejiang, CN 13 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00