Exhaust gas purification control device for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759146
APP PUB NO 20160131059A1
SERIAL NO

14894018

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exhaust gas purification control device includes an engine, an actuator using the engine as a driving source, an operation unit used by an operator to operate the actuator or the engine, an operation detector detecting whether or not the operation unit is being operated, a purification device for capturing soot in exhaust gas of the engine, an accumulation amount detector detecting an accumulation amount of the soot captured by the purification device, a regeneration unit for performing an regenerating operation of regenerating the purification device by burning the soot captured by the purification device, and a controller controlling the regenerating operation. The controller switches a control from a control of prioritizing an operation by the operation unit to a control of prioritizing the regenerating operation in a stepwise manner as the accumulation amount of the soot detected by the accumulation amount detector increases.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO CRANES CO LTD17-1 HIGASHIGOTANDA 2-CHOME SHINAGAWA-KU TOKYO 141-8626

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hanamoto, Takahiro Hyogo, JP 6 14
Sakurai, Hitoshi Hyogo, JP 38 165
Sasai, Shintaro Hyogo, JP 15 89
Shimomura, Koichi Hyogo, JP 23 142
Tsurumi, Toshiki Hyogo, JP 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00