Pile hammer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759124
SERIAL NO

14533168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pile hammer includes a cylinder, a piston displaceably guided in the cylinder, and a striker displaceably guided in the cylinder. The striker is disposed underneath the piston in the operating position of the pile hammer. A combustion chamber is delimited axially by a face surface of the striker that lies in the interior of the cylinder and by a face surface of the piston. Using at least one fuel feed device a predetermined amount of fuel can be introduced into the combustion chamber during each working cycle. A primary fuel feed device is provided, which includes a primary fuel nozzle connected with a primary fuel tank having a fuel with great anti-knock properties. The primary fuel nozzle is structured as a high-pressure injection nozzle. An ignition oil feed device is also provided, which includes an ignition oil nozzle connected with an ignition oil tank having an ignition oil. The ignition oil nozzle is structured as a low-pressure injection nozzle. A method operates such a pile hammer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELMAG GMBH & CO KGGERMAN NIDENGBAO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heichel, Matthias Aschaffenburg, DE 10 6
Jerch, Leopold Babenhausen, DE 6 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00