Supercritical working fluid circuit with a turbo pump and a start pump in series configuration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759096
APP PUB NO 20150345339A1
SERIAL NO

14801153

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the invention provided herein include heat engine systems, methods for generating electricity, and methods for starting a turbo pump. In some configurations, the heat engine system contains a start pump and a turbo pump disposed in series along a working fluid circuit and configured to circulate a working fluid within the working fluid circuit. The start pump may have a pump portion coupled to a motor-driven portion and the turbo pump may have a pump portion coupled to a drive turbine. In one configuration, the pump portion of the start pump is fluidly coupled to the working fluid circuit downstream of and in series with the pump portion of the turbo pump. In another configuration, the pump portion of the start pump is fluidly coupled to the working fluid circuit upstream of and in series with the pump portion of the turbo pump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECHOGEN POWER SYSTEMS L L CAKRON OH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vermeersch, Michael Louis Hamilton, US 18 1031

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00