Pump apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9759056
APP PUB NO 20140332095A1
SERIAL NO

14363294

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Pump apparatus comprising a base or chassis, a power unit and a reel assembly each operatively mounted to the base or chassis, a flexible conveyor conduit and flexible service line adapted to be payed out from the reel assembly and a work head including a pump operatively connected to the conveyor conduit. The work head comprises a pump having an outlet which is operatively connected to a conveying conduit, a support frame to which the pump is mounted and a powered traction drive assembly operatively mounted to the support frame. The reel assembly comprises a reel rotatably mounted to the base or chassis, a conveying conduit and a flexible service line, each being adapted to be wound thereon and payed out therefrom.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WEIR MINERALS AUSTRALIA LTDARTARMON NEW SOUTH WALES 2064

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brighton, Kevin Moffat Beach, AU 1 4
Murandi, Reman Coolum Beach, AU 1 4
Smit, Peter Cooroibah, AU 10 81
Turner, Robert Marcoola, AU 97 1066

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00