Corrosion prevention assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758879
SERIAL NO

14611370

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly of parts has a first metal part having a first surface having a corrosion resistant surface treatment and a second surface being free of corrosion resistant surface treatment, a second metal part having a third surface having a corrosion resistant surface treatment and a fourth surface being free of corrosion resistant surface treatment. The second metal part defines a recess that defines the fourth surface. The first and third surfaces are in contact. A conductive member is disposed at least in part in the recess and is in contact with the second and fourth surfaces. A sealing member disposed in the recess around the conductive member. A sacrificial anode is mounted and conductively connected to one of the first and second metal parts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRP US INC10101 SCIENCE DRIVE STURTEVANT WI 53177

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lestan, Ivan Waterford, US 2 7
Noble, Mark C Pleasant Prairie, US 20 118
Palmer, David Waukegan, US 70 2022
Skrzypchak, Mark Pleasant Prairie, US 3 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00