Method of processing lignocellulosic biomass using feedback control of hydrothermal pretreatment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758843
SERIAL NO

14378332

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method of processing lignocellulosic biomass comprising: providing lignocellulosic biomass feedstock; pretreating said biomass feedstock by continuous hydrothermal pretreatment in a pressurized reactor; measuring xylan number or lignin number in the output stream of pretreated biomass from the pretreatment reactor; and controlling the pretreatment reactor so as to maintain, in the output stream of pretreated biomass, a pre-determined level of measured xylan number or lignin number. The method allows for continuously controlling the digestibility of a lignocellulosic biomass during the step of pretreatment, and accordingly provides a continuous estimate of the severity of the pretreatment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEW ENERGY BLUE LLC480 NEW HOLLAND AVENUE SUITE 8000 LANCASTER PA 17602

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jørgensen, Pia Kolding, DK 1 3
Larsen, Jan Toramerup, DK 49 302
Mogensen, Kit Kellebjerg Fredericia, DK 6 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00