Process for the production of ethanol and solvents from lignocellulosic biomass with recycling of an ethanolic liquor obtained from the fermentation of pentoses

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758798
APP PUB NO 20140134692A1
SERIAL NO

14111869

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments provided here relate to second generation processes for the production of alcohols or solvents, wherein the lignocellulosic or cellulosic biomass undergoes a pre-treatment before being converted into ethanol after an enzymatic hydrolysis and fermentation. The glucidic polymers of the pre-treated plant material are hydrolysed by cellulases. The alcoholigenic microorganisms used for the ethanolic fermentation principally use hexoses, for example, glucose and mannose. The alcohols of the liquor, with or without separation of the suspended material are extracted by distillation. The stillage, containing pentoses which have not been used, are fermented into an ex-pentose ethanolic liquor and at least a portion of the liquor is recycled upstream of the enzymatic hydrolysis. The enzymatic hydrolysis and the ethanolic fermentation are thus carried out separately or simultaneously in the presence of a portion of the ethanolic liquor, which mixture does not interfere with the performance of the enzymes and microorganisms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFP ENERGIES NOUVELLESTHE FRENCH MAISON EMAER

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aymard, Caroline Lyons, FR 26 48
Dastillung, Rejane Lyons, FR 15 118
Menir, Sandra Gonesse, FR 7 25
Ropars, Marcel Palaiseau, FR 17 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00