High-pressure polymerization process of ethylenically unsaturated monomers in a tubular reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9758603
SERIAL NO

15461064

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present technology relates to a process for polymerizing or copolymerizing ethylenically unsaturated monomers in the presence of free-radical polymerization initiators, wherein the polymerization is carried out in a continuously operated tubular reactor at temperatures from 100° C. to 350° C. and pressures from 180 MPa to 340 MPa, with a specific reactor surface area Asp of 2 m2/(t/h) to 5.5 m2/(t/h), and the tubular reactor has a specific ratio RDsp of 0.0050 MPa−1 to 0.0069 MPa−1 and an inner surface which has a surface roughness Ra of 2 μm or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASELL POLYOLEFINE GMBHGERMANY WESSEL NING

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deuerling, Michael Weilerswist, DE 17 36
Finette, Andre-Armand Köln, DE 22 61
Groos, Georg Dannstadt-Schauernheim, DE 12 64
Khayrullin, Danir Brühl, DE 13 26
Littmann, Dieter Mücke, DE 38 181
Mei, Giulia Ferrara, IT 17 37
Mohrbutter, Jürgen Peter Alfter, DE 3 13
Wolf, Christoph Pulheim-Dansweiler, DE 21 98
Wolfram, Sven Georg Euskirchen, DE 4 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00