Multilayer laminated substrate structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9756721
APP PUB NO 20170188452A1
SERIAL NO

15096257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer laminated substrate structure includes plural substrate layers stacked with each other, and a conductive via portion. One of the substrate layers is provided with a through hole. The conductive via portion includes a first signal conductive pad having a first rib, a second signal conductive pad having a second rib, and a conductive body which is disposed in the through hole and is electrically connected to the first rib and the second rib. The first signal conductive pad and the second signal conductive pad are disposed on two opposite surfaces of the substrate layer, and the first rib and the second rib are arranged in a staggered manner in relation to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING CO LTDHSINCHU
GLOBAL UNICHIP CORPORATIONHSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jia-Liang Kaohsiung, TW 16 67
Chou, Ling-Chih New Taipei, TW 5 10
Lin, Ting-Ju Yilan County, TW 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00