Inverter control apparatus and inverter apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9755563
SERIAL NO

15115415

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an inverter control apparatus, a phase current calculation section calculates each of phase currents flowing into a motor by using measurement results of a current sensor, and a voltage command generation section calculates three-phase voltage commands by using each of the estimated phase currents. A command modulation section compares the phase voltage commands with each other, to specify a full-on phase or a full-off phase on the basis of the comparison result and then to set the voltage command of the specified phase to a full-on voltage or a full-off voltage, and offsets the voltage commands of the other two phases according to the full-on voltage or the full-off voltage to modulate the voltage commands into voltage commands allowing the line voltage between the other two phases to be kept constant. A PWM signal generation section generates PWM signals by comparing, according to a predetermined rule set in advance, three carrier waves generated by a carrier wave generation section with each of the phase voltage commands modulated by the command modulation section. Accordingly, each of the phase currents can be calculated from a DC input current, so that the efficiency can be improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES THERMAL SYSTEMS LTDSANTINGMU NO 2 FAN NO 3 TAKESHITA PILLS THE CAPITAL OF TOKYO JAPAN TOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aiba, Kenichi Tokyo, JP 7 24
Takashige, Takayuki Aichi, JP 41 345
Watanabe, Kyohei Tokyo, JP 15 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00