Systems and methods for detecting and determining sources of power disturbances in connection with effective remediation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9755419
SERIAL NO

14213838

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatus and methods for selective protection of an electrical load from disturbances on an input power line. A power protection circuit includes a selectively variable inrush current limiting circuit and a switch for disconnecting the input power line from the load. A control circuit determines that the electrical load is in a first operational state, such as a standby mode or normal operation, or a second operational state, such as full operation at rated current. The power protection circuit provides variable inrush current limiting to the electrical load in response to a first category of disturbances when the electrical load is in the first operational state. The power protection circuit inhibits disconnecting the electrical load in response to a second category of disturbances when the electrical load is in the second operational state. Species of selectively variable current limiting circuits are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • I-EWM ACQUISITION, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bright, Eugene Boca Raton, US 8 254
Luciani, Vincent P Charlotte, US 4 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00