Memory management system with power source and method of manufacture thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9754634
SERIAL NO

13303863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacture of the memory management system includes: fabricating a dual in-line memory module carrier; mounting a volatile memory device on the dual in-line memory module carrier; mounting a non-volatile memory on the dual in-line memory module carrier on a side opposite the volatile memory device; mounting an uninterruptible power supply on the dual in-line memory module carrier for maintaining a memory module power when a system power input decays; and mounting a controller logic integrated circuit on the dual in-line memory module carrier coupled to the volatile memory device, the non-volatile memory, and the uninterruptible power supply for copying data content of the volatile memory device to the non-volatile memory when the uninterruptible power supply detects the decay of the system power input to a first cross-over level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SMART MODULAR TECHNOLOGIES INC39870 EUREKA DRIVE NEWARK CA 94560

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brooks, Joshua Harris Alameda, US 2 12
Frey, Robert Tower Milpitas, US 12 393
Marino, Kelvin Laguna Hills, US 6 79
Shen, Jinying San Ramon, US 7 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00