Safety device and computation method for safety device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9753437
APP PUB NO 20130245794A1
SERIAL NO

13989888

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A safety device includes a first computation unit, a second computation unit, an output control unit, and a first central processing device. The first computation unit is configured to perform a first computation on a detected value detected from a subject to be controlled, thus obtaining a first result value. The second computation unit is configured to perform a second computation on the detected value, thus obtaining a second result value which is to be determined if equal to the first result value. The output control unit is configured to output the first result value in a case that the second computation unit determines that the first result value is equal to the second result value, and not to output the first result value in a case that the second computation unit determines that the first result value is not equal to the second result value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daigo, Katsuya Tokyo, JP 3 35
Emoto, Hideaki Tokyo, JP 17 50
Ishii, Kiyoshi Tokyo, JP 42 578
Morimoto, Kenichi Tokyo, JP 49 854
Soga, Masanobu Tokyo, JP 1 5
Toda, Shinichi Tokyo, JP 21 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00