Single-use valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752694
APP PUB NO 20150276077A1
SERIAL NO

14435397

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The single-use valve to be installed on a line for transporting a fluid includes a tubular body, which is intended to be placed on the line and contains a mobile element that is able to take up two positions in the tubular body. Each position allows the fluid to pass through the tubular body or not, one being a standby position, while the other is an active position. Inside the tubular body, a driver able to move the mobile element such that the mobile element passes from its standby position to the active position. The driver includes a pretensioned elastic device. Outside the tubular body, a device for maintaining the pretension connects to a controller able to deactivate the device for maintaining the tension.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONSEIL ET TECHNIQUE31650 LAUZERVILLE
CENTRE NATIONAL D?ETUDES SPATIALES CNES18 AVENUE EDOUARD BELIN TOULOUSE 31000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dilhan, Denis Auterive, FR 6 52
Salvetat, Bernard Toulouse, FR 1 0
Valembois, Guy Lauzerville, FR 43 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00