Deck pedestal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752331
SERIAL NO

15355778

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A support pedestal for adjustably supporting a building surface component above a fixed surface and including a base member having a base plate that is configured to be placed upon a surface, a support member having a support plate that is configured to support at least one building surface component, and an adjustment apparatus interconnecting the base member and the support member that facilitates adjustment of each of the base member and support member relative to the other of the base member and the support member in numerous manners. The adjustment apparatus includes a first connector receivable in a first receiver attached to and extending away from one of the base plate or support plate, a second connector attachable to the other of the base plate or support plate, and a shaft threadably interconnecting the base and support connectors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNITED CONSTRUCTION PRODUCTS LLC701 OSAGE ST BLDG 2 UNIT 120 DENVER CO 80204

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knight,, III Stephen J Littleton, US 29 501
Kugler, William E Denver, US 42 847

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00