Magnesium alloy coil stock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752220
APP PUB NO 20120276402A1
SERIAL NO

13511920

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There are provided a magnesium alloy coil stock having good flatness and a method for producing the magnesium alloy coil stock, and a magnesium alloy structural member that uses the coil stock and a method for producing the magnesium alloy structural member. The coil stock is obtained by coiling a sheet composed of a magnesium alloy in a cylindrical shape, and the internal diameter of the coil stock is 1000 mm or less. The coil stock can be produced by rolling a cast material obtained by subjecting a magnesium alloy to continuous casting, subjecting the rolled sheet to warm leveling, and coiling the worked sheet in a cylindrical shape while the temperature just before coiling is decreased to 100° C. or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO ELECTRIC INDUSTRIES LTDOSAKA CITY OSAKA OF JAPAN OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Ryuichi Itami, JP 32 124
Kawabe, Nozomu Osaka, JP 75 394
Kitamura, Takahiko Itami, JP 18 47
Mizuno, Osamu Itami, JP 109 1233
Mori, Nobuyuki Itami, JP 119 2284
Oishi, Yukihiro Osaka, JP 41 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00