Process for the rapid hydrolysis of high solids biomass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752169
SERIAL NO

15361732

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The process for the hydrolysis of ligno-cellulosic biomass comprises the steps of

    A) Contacting a ligno-cellulosic feedstock, the feedstock comprised of biomass having a dry content and water with at least a portion of a solvent, the solvent comprised of water soluble hydrolyzed species; wherein at least some of the water soluble hydrolyzed species are the same as the water soluble hydrolyzed species obtainable from the hydrolysis of the biomass in the feedstock;B) maintaining the contact between the feedstock of the feedstock stream and the solvent at a temperature in the range of 20° C. to 200° C. for a time in the range of 5 minutes to 72 hours to create a hydrolyzed product from the biomass in the feedstock.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERSALIS S P APIAZZA BOLDRINI 1 20097 SAN DONATO MILANESE (MI) 20097

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cherchi, Francesco Campobasso, IT 15 67
Cotti, Comettini Marco Trivero, IT 14 57
Ferrero, Simone Tortona, IT 34 106
Garbero, Mirko Turin, IT 6 57
Ottonello, Piero Genoa, IT 20 70
Riva, Alberto Arquata Scrivia, IT 8 113
Torre, Paolo Arenzano, IT 19 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00