Treatment process and apparatus for reducing high viscosity in petroleum products, derivatives, and hydrocarbon emulsions, and the like

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752082
APP PUB NO 20160060543A1
SERIAL NO

14756944

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The reduction of viscosity of petroleum products and hydrocarbon emulsions and the like is effected by applying electrodynamic shocks unto a foaming streamflow of the high viscosity emulsion to create a densely whirled streamflow by agitation with a high radial gradient of pressure. Chemical bonding breakup and destruction of long structured molecules of paraffin occur in the emulsion to result in the formations of free radicals and carbamides, and separation of a processed mixture into light and heavy fractions. The process alters the physiochemical properties of the emulsion to cause decrease of density, and the reduction of viscosity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
1861244 ONTARIO INC311 RICHMOND STREET RICHMOND HILL ONTARIO L4C 3Z2

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Novikov, Nicolai Rybinsky, RU 2 0
Rakhinskiy, Sergey Maple, CA 4 6
Saidakovsky, Lazarus Thornhill, CA 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00