Tube made of hydrophilized silicone

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752031
APP PUB NO 20150099079A1
SERIAL NO

14508624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for the production of a piece made of silicone including: (a) the blending of 100 parts by weight of an HCR silicone base having a viscosity of greater than 106 mPa·s with from 0.3 to 7 parts by weight, such as from 0.5 to 5 parts by weight, of an amphiphilic copolymer including hydrophobic polydiorganosiloxane blocks and hydrophilic poly(ethylene oxide), poly(propylene oxide) or ethylene oxide and propylene oxide copolymer blocks, until a homogeneous blend of HCR base and amphiphilic copolymer is obtained, (b) the shaping of the homogeneous blend obtained, and (c) the curing of the shaped blend by heating or irradiation. It also relates to a piece, in particular a tube, manufactured according to this process and to a device comprising such a tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAINT-GOBAIN PERFORMANCE PLASTICS FRANCE89120 CHARNY ORÉE DE PUISAYE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jaffrennou, Boris Paris, FR 32 376
Le, Baron Christophe Montargis, FR 1 1
Letailleur, Alban Paris, FR 9 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00