Phosphorus-containing compounds useful for making halogen-free, ignition-resistant polymers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752010
SERIAL NO

15207225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for making a phosphorus-containing compound is disclosed. The process comprises contacting a compound of formula (A) wherein RA and RB are selected from optionally substituted aryl, aryloxy, alkyl and alkoxy groups or can be combined to form cyclic structures; and RC is methyl, ethyl, isopropyl, n-butyl, i-butyl, t-butyl, phenyl or benzyl; and a compound of formula (B) wherein R1-R4 are selected from optionally substituted aryl, aryloxy, alkyl and alkoxy groups. The phosphorus-containing compound can then be used as a flame retardants for polymers, especially for epoxy, polyurethane, thermosetting resins and thermoplastic polymers. Such flame retardant-containing polymers can be used to make protective coating formulations and ignition-resistant fabricated articles, such as electrical laminates, polyurethane foams, and various molded and/or foamed thermoplastic products.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUE CUBE IP LLC2030 DOW CENTER MIDLAND MI 48674

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mullins, Michael J Houston, US 122 1439
Worku, Anteneh Z Pearland, US 13 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00