Regeneration of cellulose

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751955
APP PUB NO 20140343270A1
SERIAL NO

14450362

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for regeneration of a cellulose containing material, comprises the steps: a) exposing the cellulose containing material to oxygen with an alkali aqueous solution at a pH of at least 9, and a temperature of at least 20° C., b) dispersing the cellulose containing material in the alkali aqueous solution, wherein the temperature of the alkali aqueous solution is lowered below 15° C., and wherein the pH of the alkali aqueous solution is above 9, c) adding an organic solvent to the dispersion to precipitate cellulose, and d) separating the precipitated cellulose by at least one method selected from filtering and centrifugation. The method makes it possible to maintain a high alkali pH value in the process, which saves costs since the pH value does not have to be lowered by additions of various additives. The method makes it possible to remove non-cellulose parts of the cloth.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CIRCULOSE AB103 23 STOCKHOLM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Henriksson, Gunnar Solna, SE 10 99
Lindström, Mikael Lidingö, SE 11 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00