Precursor compound connected to solid support for manufacturing 18F radiopharmaceutical, method for manufacturing same, and application thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751844
SERIAL NO

13994339

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a solid precursor in the form of an organic salt, the solid precursor having a solid support, a method for manufacturing same, and an application thereof. The solid precursor of the present invention enables omission of the [18F]fluoride refining process using additional cartridge, and the use of excessive phase-transfer catalyst, and can easily remove remaining substance after reaction through the solid support inside the precursor. The solid precursor of the present invention is very appropriate for an automated synthesis device as an all-in-one system that can carry out overall process of [18F]fluorosis reaction, when used by charging in a cartridge.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUTURECHEM CO LTDSEOUL 04782

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chi, Dae-Yoon Seoul, KR 9 38
Chu, So-Young Seoul, KR 2 10
Jung, Woon-Jung Seoul, KR 1 3
Kwon, Hye-Rim Incheon, KR 2 3
Lee, Byoung-Se Seoul, KR 5 17
Lee, Jae-Hak Incheon, KR 27 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00