Grappler overload protection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751734
SERIAL NO

15397322

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A grappler overload protection system uses a load-measuring device to provide a first load indication for preventing the grappler from bearing an unsafe load when the first load indication exceeds a first limit. A grappler overload protection method determines a spread of grappler arms based on information from a first sensor, determines an expected weight of the load based on the spread of the grappler arms, and compares the expected weight to a first limit for preventing the grappler from bearing an unsafe load. The method may optionally determine an angle of a boom supporting the grappler for determining an expected torque on the boom based on the boom angle and the expected weight of the load. The method may take preventative measures to prevent the grappler from bearing the load when the expected weight exceeds the first limit or when the expected torque exceeds a second limit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALTEC INDUSTRIES INC210 INVERNESS CENTER DRIVE BIRMINGHAM AL 35242

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boger, David K Sonoma, US 10 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00