Hydraulic dual control device for bicycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751591
APP PUB NO 20160200390A1
SERIAL NO

14909776

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle dual control device hydraulically operated, so that using one single device the cyclist may operate, by applying different hand pressures or taps from the handlebar, two unidirectional control mechanisms, preferably a brake and a bicycle gear-shifting mechanisms. The control device comprises two unidirectional control units within a single lever or handgrip attached to the handlebar, wherein each one of them comprises an acting member, an operating member connected to a control circuit and a coupling element which links the two previous members. In a preferred embodiment of the invention, the operating member related to the gear shifting is hydraulic and comprises a piston and a cylinder mounted integrated inside the brake acting member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROTOR COMPONENTES TECNOLOGICOS S L28864 AJALVIR (MADRID)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carrasco, Vergara Pablo Madrid, ES 13 84
Carton, Cordero Carlos Miguel Madrid, ES 4 18
Martinez, Garcia David Madrid, ES 4 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00