Air conditioning system and heat exchanger

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751378
SERIAL NO

14787334

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioning system comprises a compressor (1), an outdoor heat exchanger (3), a first heat exchanger (101), a second heat exchanger (102) and at least two throttling devices, wherein the outdoor heat exchanger is a micro-passage heat exchanger and comprises a first inlet (31), a second inlet (32), an outlet (33), a distributing pipe (36), a collecting pipe (37), a flat pipe (38), a fin (39) and a distributor (34) which is located in the distributing pipe (36) and used for distributing a working medium, and a distribution small hole (35) is provided in the distributor (34); and the first inlet (31) is in direct communication with a distributing cavity (30) of the distributing pipe (36), while the second inlet (32) is in communication with the distributing cavity (30) through the distributing small hole (35) in the distributor (34).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HANGZHOU SANHUA RESEARCH INSTITUTE CO LTDNO 289-2# 12TH STREET ECONOMIC & TECHNOLOGICAL DEVELOPMENT AREA HANGZHOU ZHEJIANG 310018 310018

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Shaolong Zhejiang, CN 4 10
Huang, Linjie Zhejiang, CN 39 137
Liu, Weihua Zhejiang, CN 48 204
Tan, Yongxiang Zhejiang, CN 13 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00