Method for manufacturing a golf ball

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751272
SERIAL NO

13895755

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object of the present invention is to provide a method for manufacturing a golf ball excellent in kneading workability when preparing a core rubber composition containing (d) a carboxylic acid and/or a salt thereof. The present invention provides a method for manufacturing a golf ball comprising the steps of blending (a) a base rubber and at least (b) a carboxylic acid and/or a salt thereof to prepare a first masterbatch; blending (a) a base rubber and at least (c) a crosslinking initiator to prepare a second masterbatch; blending the first masterbatch and second masterbatch to form a core rubber composition; molding the core rubber composition into a spherical core; and forming one or more cover layers covering the spherical core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO RUBBER INDUSTRIES LTD6-9 WAKINOHAMA-CHO 3-CHOME CHUO-KU KOBE-SHI HYOGO 651-0072

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujisawa, Koichi Kobe, JP 80 654
Okabe, Satoko Kobe, JP 37 258
Tanigawa, Yusuke Kobe, JP 3 9
Yokota, Masatoshi Kobe, JP 95 3061

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00