Height adjustable concrete form assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751236
SERIAL NO

14595855

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A form assembly is provided for forming a concrete structure during setting of the concrete. Included in the form assembly are a first barrier assembly having a first inner surface and a first outer surface; a second barrier assembly having a second inner surface, a second outer surface, an upper barrier, and a lower barrier. A channel is defined by the first and second inner surfaces of the first and second barrier assemblies for pouring the concrete into the channel. The second barrier assembly includes at least one height adjustment assembly being connected at one end to the upper barrier, and at an opposite end to the lower barrier such that the upper barrier vertically reciprocates along a vertical guide of the upper barrier relative to the lower barrier for adjusting an overall height of the form assembly using the at least one height adjustment assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METAL FORMS CORPORATION3334 N BOOTH STREET MILWAUKEE WI 53212

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daul, Justin Wauwatosa, US 1 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00