Agricultural feed mixer transmission torque sensor assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9751058
APP PUB NO 20170065949A1
SERIAL NO

15257551

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein is an exemplary torque sensing assembly for a feed mixer that includes, a frame of a feed mixer, the frame having a first frame portion and a second frame portion; a transmission having at least two speeds, a housing, an input shaft, and an output shaft, a load cell secured to a second frame portion of the frame; a mounting plate having a first side portion and a second side portion situated opposite the first side, the transmission secured by a plurality of fasteners to a top surface of the mounting plate, hinge rotatably connecting the first side portion to the first frame portion, and a load contact point situated in contact with the load cell, wherein a resultant torque is impartable to the housing to provide a downward force on the load cell, via the load contact point.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PATZ CORPORATION917 BUSINESS 141 POUND WI 54161

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bedord, Bradley Crivitz, US 4 28
Pellman, David C Coleman, US 11 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00