Synchronized slotted power line communication

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9749012
SERIAL NO

14214095

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and a device are disclosed including a PLC node having a synchronizer, a modem with a transceiver, and a computing device coupled with a power line for power line data communications. In various embodiments, a coordinator or Data Concentrator Unit (DCU) coordinates the communication of PLC nodes. The PLC nodes are configured to detect a zero crossing of the power line wave form and transmit or receive data within time slots defined with respect to the detected zero crossing. In other embodiments, the time slots may be synchronized using a frame sync signal, an external signal, or polling. In various embodiments, the time slots may be random access or assigned. In some embodiments, the modem and/or node may be placed in a sleep mode when not communicating to reduce power consumption and be awaken when an allocated time slot is approaching.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JPMORGAN CHASE BANK N A AS SUCCESSOR AGENT10 S DEARBORN FLOOR L2 CHICAGO IL 60603

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anburaj, Michael Mountain House, US 3 19
Farrokhi, Farrokh San Ramon, US 30 427

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00