Power stabilization circuit and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9748836
SERIAL NO

14803686

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power stabilization circuit including a first reference power supply, a second reference power supply, and a combiner circuit coupled to the first reference power supply and the second reference power supply. The first reference power supply is configured to receive a first control signal, generate a first reference signal based on the first control signal, and provide the first reference signal to a first output power supply. The second reference power supply is configured to receive a second control signal, generate a second reference signal based on the second control signal, and provide the second reference signal to a second output power supply. The combiner circuit is configured to generate a combined reference signal based on the first reference signal and the second reference signal and drive a reference load based on the combined reference signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUANTANCE INCWOBURN MA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vinayak, Vikas Menlo Park, US 44 1661

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00