System and method for maintaining and establishing operational readiness in a fuel cell backup system of a nuclear reactor system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9748006
SERIAL NO

12924753

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus for maintaining or establishing a readiness state in a fuel cell backup system of a nuclear reactor system are disclosed. A method includes maintaining a readiness state of a fuel cell system within a set of readiness parameters, the readiness parameters a function of a characteristic of the nuclear reactor system. Another method includes monitoring a nuclear reactor system characteristic and, responsive to the monitored nuclear reactor system characteristic, establishing a readiness state of a fuel cell system. An apparatus includes a fuel cell system associated with a nuclear reactor system and a fuel cell control system configured to maintain a readiness state of the fuel cell system. Another apparatus includes a fuel cell system associated with a nuclear reactor system, a nuclear reactor characteristic monitoring system, and a fuel cell control system configured to establish a readiness state of the fuel cell system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TERRAPOWER LLC15800 NORTHUP WAY BELLEVUE WA 98008

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hyde, Roderick A Redmond, US 2911 61857
Tegreene, Clarence T Bellevue, US 1905 49070
Walter, Joshua C Kirkland, US 79 487

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00