System and method for controller adaptation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9747543
SERIAL NO

14869961

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A neural-Model Predictive Control (MPC) controller is described to control a dynamical system (i.e., “plant”). The MPC controller receives, in a base controller, a measurement of a current state of a plant and generates a control signal based on the measurement of the current state of the plant. A forward module receives the measurement of the current state of the plant and the control signal to generate a forward module prediction. A forward module corrector receives the measurement of the current state of the plant and the control signal from the base controller to generate an additive correction to the forward module prediction to generate a predicted plant state. Control sequences of length L of pairs of control signals and corresponding predicted plant states are generated until Ns control sequences have been generated. A next plant control signal is generated based on the Ns control sequences.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HRL LABORATORIES LLC3011 MALIBU CANYON RD MALIBU CA 90265-4799

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoffmann, Heiko Simi Valley, US 73 497
Martin, Charles E Thousand Oaks, US 49 442

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00