Power-and-ground (PG) network characterization and distributed PG network creation for hierarchical circuit designs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9747403
SERIAL NO

14798250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chip layout can include a top-level portion and a set of blocks. The power-and-ground (PG) network for the chip layout can be specified by a set of chip-level PG constraints that is defined using a PG constraint definition language. The set of chip-level PG constraints can be characterized into new sets of PG constraints that correspond to smaller regions of the chip layout, e.g., a set of top-level PG constraints that corresponds to the top-level portion, and a set of block-level PG constraints for each block in the set of blocks. The new sets of PG constraints can then be provided to one or more instances of a PG compiler that executes on one or more processors to create the PG network for the chip layout.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNOPSYS700 E MIDDLEFIELD ROAD MOUNTAIN VIEW CA 94043-4033

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiang, Yi-Min San Jose, US 35 150
Lin, Yan Pleasanton, US 99 320
Qui, Xiang Mountain View, US 1 0
Rashingkar, Balkrishna R San Jose, US 8 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00