Mass levitator with energy conversion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9745952
SERIAL NO

14151923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The various embodiments disclosed herein provide a generalized system for extracting gravitational energy from the planet and provide for a general, pollution free, mass lifting and energy conversion system in which the laws of fluid flow, and in particular buoyancy and gravity are utilized to lift an arbitrary mass to a higher gravitational potential energy, where upon the increased potential energy can be converted to other forms of energy. Novel and non-obvious features of the fluid interface device, used to insert the buoyant object into the buoyant fluid, insure that the insertion energy is less than the potential energy gained by the object. The net increase in potential energy can be converted to other forms of energy such as electrical power or mechanical energy. It is shown in that energy gain is effectively extracted from the gravitational field of the planet without breaking the laws of conservation of energy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WESTMORELAND DOUGCLARENCE NY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Westmoreland, Doug Clarence, US 2 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00