Composite nanofiber membrane for adsorbing lithium, method of manufacturing the same and apparatus and method for recovering lithium using the same
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Aug 29, 2017
Grant Date -
Sep 17, 2015
app pub date -
Jan 15, 2015
filing date -
Mar 11, 2014
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
Disclosed are a composite nanofiber membrane for the adsorption of lithium, a method for preparing the same, and a lithium recovery apparatus and method using the same. The composite nanofiber membrane for the adsorption of lithium is immobilized with manganese oxide selectively adsorptive of lithium. The composite nanofiber membrane for lithium adsorption exhibits high selectivity for lithium ions and allows for the rapid and easy diffusion of lithium ions through interstitial spaces of the adsorbent. Particularly, the lithium recovery apparatus using the composite nanofiber membrane for lithium adsorption is able to effectively adsorb lithium ions dissolved in seawater in a selective manner within a short period of time, thus reducing the time taken for the adsorption process.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
MYONGJI UNIVERSITY INDUSTRY AND ACADEMIA COOPERATION FOUNDATION | 116 MYONGJI-RO CHEOIN-GU YONGIN-SI GYEONGGI-DO 17058 |
International Classification(s)
- C22B:PRODUCTION OR REFINING OF METALS
- D01D:MECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE....
- B01J:CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS, CO....
- D06M:TREATMENT, NOT PROVIDED FOR ELSEWHERE IN CLASS D0....
- D01F:CHEMICAL FEATURES IN THE MANUFACTURE OF ARTIFICIAL....
- C02F:TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE....

- 2015 Application Filing Year
- C22B Class
- 326 Applications Filed
- 251 Patents Issued To-Date
- 77 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Beltran, Arnel B | Gyeonggi-do, KR | 1 | 21 |
# of filed Patents : 1 Total Citations : 21 | |||
Chung, Wook-Jin | Gyeonggi-do, KR | 4 | 30 |
# of filed Patents : 4 Total Citations : 30 | |||
Lee, Seong-Poong | Gyeonggi-do, KR | 2 | 22 |
# of filed Patents : 2 Total Citations : 22 | |||
Nisola, Grace M | Gyeonggi-do, KR | 2 | 22 |
# of filed Patents : 2 Total Citations : 22 | |||
Park, Myoung Jun | Gyeonggi-do, KR | 2 | 22 |
# of filed Patents : 2 Total Citations : 22 | |||
Seo, Jeong Gil | Gyeonggi-do, KR | 11 | 57 |
# of filed Patents : 11 Total Citations : 57 | |||
Torrejos, Rey Eliseo C | Gyeonggi-do, KR | 2 | 22 |
# of filed Patents : 2 Total Citations : 22 | |||
Yoo, Young Deuk | Gyeonggi-do, KR | 1 | 21 |
# of filed Patents : 1 Total Citations : 21 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- C22B Class
- 0 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Feb 28, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Feb 28, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
