Process for the intense conversion of residues, maximizing the gasoline yield

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9745527
APP PUB NO 20160177203A1
SERIAL NO

14974968

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the intense conversion of a heavy hydrocarbon feed, comprising a) ebullated bed hydroconversion of the feed; b) separating at least a portion of hydroconverted liquid effluent obtained from a); c)i) either hydrotreatment of at least a portion of the gas oil fraction and of the vacuum gas oil fraction obtained from b), ii) or hydrocracking at least a portion of gas oil fraction and vacuum gas oil fraction obtained from b); d) fractionation of at least a portion of the effluent obtained from c)i) or c)ii); e) recycling at least a portion of unconverted vacuum gas oil fraction obtained from the fractionation d) to said first hydroconversion a); f) hydrocracking at least a portion of gas oil fraction obtained from fractionation d); g) recycling all or a portion of effluent obtained from f) to the fractionation d).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AXENS92508 RUEIL-MALMAISON CEDEX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frecon, Jacinthe Rueil-Malmaison, FR 9 42
Morel, Frederic Chatou, FR 58 916

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00