Method for manufacturing heat-shielding film, heat-shielding film, and heatshielding curtain

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9745426
SERIAL NO

14904624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments relate to a method for manufacturing a heat-shielding film in which a heat-shielding material has been well dispersed in a polyvinyl chloride resin. According to one embodiment, the method for manufacturing the heat-shielding film includes (1) mixing a polyvinyl chloride resin composition (P) containing the polyvinyl chloride resin (A) using a blender, and (2) adding and further mixing the heat-shielding material with the mixture obtained in step (1 The heat-shielding material contains at least antimony-doped tin oxide micro-particles (B) in an amount in which the mass ratio of the polyvinyl chloride resin (A) to antimony-doped oxidized tin micro-particles (B) is 100 parts by mass to 1.5 to 15 parts by mass. The heat-shielding material is composed of antimony-doped oxidized tin micro-particles (B) alone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RIKEN TECHNOS CORPORATIONTOKYO 101-8336

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hiugano, Motoi Tokyo, JP 1 0
Sugimoto, Hidemasa Tokyo, JP 5 15
Takahashi, Tomohiro Tokyo, JP 169 747

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00