Device of generatively manufacturing three-dimensional objects with insulated building field

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9744723
SERIAL NO

12982491

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a device for generatively manufacturing a three-dimensional object (3), comprising: a frame (1) defining a building field (6) at an upper portion (2) thereof; a plate (12) which connects the frame (1) with a housing (100) of the device; a support (5) which is arranged in the frame (1) and vertically movable by a lift mechanics (4) at least below the building field (6); a radiation device (7) which generates an energetic beam (8, 8′) which is focused by a deflection means (9) to arbitrary points in the building field (6), so as to selectively sinter or melt a powdery material (11) which is present in the building field (6); a coater (10) for applying a layer of powdery material (11) onto the support (5) or a previously applied layer of the powdery material (11). A thermal insulation (13) is arranged between the frame (1) and the plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EOS GMBH ELECTRO OPTICAL SYSTEMS82152 KRAILLING

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baumann, Andreas Gräfelfing, DE 44 543
Mattes, Thomas Gilching, DE 29 2394
Philippi, Jochen Gräfelfing, DE 29 2155

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00