Clad material, method of manufacturing brazed pipe, and brazed pipe

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9744610
SERIAL NO

14311352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A clad material includes a core material, a first skin material covering one side of the core material, and a second skin material covering the other side of the core material. The clad material is brazed in a state in which the first and second skin materials overlap each other. The core material is made of an Al alloy containing Mn (0.6 to 1.5 mass %), Ti (0.05 to 0.25 mass %), Cu (less than 0.05 mass %), Zn (less than 0.05 mass %), Fe (0.2 mass % or less), and Si (0.45 mass % or less) (balance: Al and unavoidable impurities). The first skin material is made of an Al alloy containing Si (6.8 to 11.0 mass %) and Zn (0.05 mass % or less) (balance: Al and unavoidable impurities). The second skin material is made of an Al alloy containing Si (4.0 to 6.0 mass %) and Cu (0.5 to 1.0 mass %) (balance: Al and unavoidable impurities).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAHLE INTERNATIONAL GMBHSTUTTGART GERMANY STUTTGART BADEN-WURTTEMBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikawa, Youhei Oyama, JP 3 8
Takahashi, Kazuyuki Oyama, JP 191 1751
Terada, Takashi Oyama, JP 116 641

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00