Converting apparatus, contents converting method, and computer readable recording medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9741396
APP PUB NO 20150334343A1
SERIAL NO

14716157

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A contents converting apparatus, a contents converting method, and a computer readable recording medium are provided. The contents converting apparatus is for converting contents including a plurality of stream data and stored in a Blu-ray disc. The contents converting apparatus includes a controller configured to receive manifest information of a data structure configuring the contents, and determine stream data to be copied from the Blu-ray disc based on the manifest information. The convents converting apparatus further includes a formatter configured to convert the determined stream data of a first format to new stream data of a second format.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDSUWON-SI 16677
GANGNEUNG-WONJU NATIONAL UNIVERSITY INDUSTRY ACADEMY COOPERATION GROUP120 GANGNEUNG DAEHANGNO GANGWON-DO GANGNEUNG-SI 210-702

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bak, Bong-gil Suwon-si, KR 51 413
Park, Sung-wook Gangneung-si, KR 253 3621
Yang, Jong-ho Yongin-si, KR 32 560

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00