Pipelined ECC-protected memory access

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9740557
SERIAL NO

14612084

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one aspect, a pipelined ECC-protected cache access method and apparatus provides that during a normal operating mode, for a given cache transaction, a tag comparison action and a data RAM read are performed speculatively in a time during which an ECC calculation occurs. If a correctable error occurs, the tag comparison action and data RAM are repeated and an error mode is entered. Subsequent transactions are processed by performing the ECC calculation, without concurrent speculative actions, and a tag comparison and read are performed using only the tag data available after the ECC calculation. A reset to normal mode is effected by detecting a gap between transactions that is sufficient to avoid a conflict for use of tag comparison circuitry for an earlier transaction having a repeated tag comparison and a later transaction having a speculative tag comparison.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MIPS TECH LLC3201 SCOTT BLVD SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rozario, Ranjit J San Jose, US 23 247
Sudhakar, Ranganathan Santa Clara, US 20 571

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00