Primary controller designation in fault tolerant systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9740178
APP PUB NO 20140277608A1
SERIAL NO

13803290

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fault tolerant controller system includes a first controller and a second controller. One of the first and second controllers designated as a primary controller for generating control signals intended to control actuation devices on a vehicle under non-fault operating conditions, and the other of the first and second controllers designated as a secondary controller generating control signals intended to control actuation devices on the vehicle. The actuation devices are responsive only to the designated primary controller. An error is detected in the primary controller and a message is transmitted from the faulty controller to the non-faulty controller identifying the error. The non-faulty controller is subsequently designated as the primary controller. The control signals including an identifier that identifies the non-faulty controller as the designated primary controller. In response to detecting the error, the faulty controller is reset to operate in a safe operating mode as the secondary controller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCPO BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baker, Stephen M Oxford, US 18 1666
Debouk, Rami I Dearborn, US 17 1005
Joyce, Jeffrey North Vancouver, CA 3 500

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00