Automated method and apparatus for testing a power converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9739841
SERIAL NO

14260586

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus for testing operability of a power converter with an existing power conversion assembly of a renewable energy system is disclosed. The method includes transferring a first pulse of energy from an existing power conversion assembly to a power filter of the power converter through first cells within a bridge circuit of the power converter. Another step includes determining a first current-voltage feedback associated with the first pulse. A next step includes transferring a second pulse of energy from the power filter to the existing power conversion assembly through second cells within the bridge circuit such that a portion of the first pulse moves back to the existing power conversion assembly. Another step includes determining a second current-voltage feedback associated with the second pulse. The first and second current-voltage feedbacks are compared with nominal tolerances of the power converter to ensure the power converter is operating properly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berroteran, Gil Igor Salem, US 5 33
Klodowski, Anthony Michael Hardy, US 45 661
Smith, David Daleville, US 516 10998

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00