RFeB system sintered magnet production method and RFeB system sintered magnet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9738965
APP PUB NO 20160273091A1
SERIAL NO

14777624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Producing an RFeB system sintered magnet with high corrosion resistance and low loss of energy in an RFeB system sintered magnet with high magnetic properties produced by a grain boundary diffusion process. A paste prepared by mixing an organic matter having a molecular structure including an oxygen atom and a metallic powder containing a heavy rare-earth element which is at least one element selected from the group of Dy, Ho and Tb, is applied to the surface of an RFeB system sintered compact composed of crystal grains whose main phase is R2Fe14B containing, as a main rare-earth element, a light rare-earth element which is at least one element selected from the group of Nd and Pr. A heating process for a grain boundary diffusion treatment is performed. As a result, a protective layer containing an oxide of the light rare-earth element is formed on the surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DAIDO STEEL CO., LTD.;INTERMETALLICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sagawa, Masato Kyoto, JP 88 1129
Takagi, Shinobu Niwa-gun, JP 52 386

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00