Packet switch device and method of the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9736073
APP PUB NO 20140341030A1
SERIAL NO

14185940

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A packet switch device includes an input port, a loop-back port, a storage module, and a switch engine. The input port receives a packet. The storage module stores packet flow tables. Each packet flow table includes at least one flow entry and action. The switch engine compares the packet with a default packet flow table of the plurality of packet flow tables when it determines that the packet does not include a flow header. The switch engine includes the packet with the flow entry of the default packet flow table and performs the corresponding action when the packet matches the flow entry. When the action includes a specific action of comparing the packet with another one of the packet flow tables, the switch engine attaches the flow header to the packet to set a flow ID therein and transmits the packet back to the switch engine through the loop-back port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACCTON TECHNOLOGY CORPORATIONNO 1 CREATION RD 3 SCIENCE-BASED INDUSTRIAL PARK HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuo, Hui-Chen Tainan, TW 7 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00