Power conversion apparatus with power saving and high conversion efficiency mechanisms

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9735693
SERIAL NO

14689041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion apparatus is provided. The power conversion apparatus includes a transformer, a synchronous rectification (SR) transistor and an SR control circuit. A first terminal of a primary side of the transformer receives an input voltage. A first terminal of a secondary side of the transformer provides an output voltage to a load. A first drain/source terminal of the SR transistor is coupled to a second terminal of the secondary side of the transformer. A second drain/source terminal of the SR transistor is coupled to a first ground terminal. A gate terminal of the SR transistor receives a control signal. The SR control circuit receives a signal of the first drain/source terminal of the SR transistor to determine statuses of the load and generate the control signal. When the load is a light load, the SR control circuit enters a power-saving mode and turns off the SR transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POWER FOREST TECHNOLOGY CORPORATION3F -3 NO 18 TAIYUAN ST ZHUBEI CITY HSINCHU COUNTY 30265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shein, Chein-Kuo Taipei, TW 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00