Large current transmission connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9735489
SERIAL NO

15232768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The application discloses a large current transmission connector including the pallet assembly and the socket assembly. The pallet assembly includes the pallet and the guide pillar. The socket assembly includes a socket. The socket includes mounting holes and pins. The locking structure is arranged in the mounting hole. The locking structure is used for fixing the guide pillar on the socket and for conveying a current between the pallet assembly and the socket assembly. When the guide pillar and the locking structure are fixed together, the two guide pillars not only play the role of guiding, but also can carry the large current of 50 A. Thus, this connector does not need to set aside a lot of space for mounting the power supply pins. The space of the connector is saved effectively. The miniaturization trend of the connector is met.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMPHENOL COMMERCIAL PRODUCTS (CHENGDU) CO LTDSUITE D3 MOLDING TOOL INDUSTRIAL PARK WEST DISTRICT OF CHENGDU TECH ZONE CHENGDU 611731

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Jun Suining, CN 146 1005

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00